Pipe bridges for north tp gullies

Eric donated 10″ pvc pipe from his farm. We used 95′ for two gully crossings.

Paul and Mike cutting the 5′ lengths for the return route.

Chris and Eric working on the upper level.

Eric, Chris, Paul, and Mike on the finished product.

No endos and quick drying for this crossing now.

Dave brought his wheelbarrow to bring some drier dirt over the outbound gully pipe. I expect big rains to overflow these four pipes so take a peak after a heavy rain before bombing through this – the pipes may be bare.

Looking the way you cross outbound.

Fortunate to have a great work crew that lives within a few miles of the trail.Things went pretty quickly – about 10 hours of labor to install.

edit:
Mike is really quick at posting his pics and quips:
http://bikingfools.blogspot.com/2011/04/playing-in-mud.html